{"id":21930,"date":"2023-04-21T15:22:47","date_gmt":"2023-04-21T13:22:47","guid":{"rendered":"https:\/\/www.certification-india.com\/?page_id=21930"},"modified":"2025-11-17T11:26:53","modified_gmt":"2025-11-17T10:26:53","slug":"what-is-dgms","status":"publish","type":"page","link":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/","title":{"rendered":"What is DGMS"},"content":{"rendered":"\n<h4 class=\"wp-block-heading is-style-header-headline-white\">your one-stop certification <strong>solution!<\/strong><\/h4>\n\n\n\n<h1 class=\"wp-block-heading is-style-h1-headline-content\">What is DGMS Approval?<\/h1>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"220\" height=\"219\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/india-authority-directorate-general-of-mines-safety-logo.jpg\" alt=\"india-authority-directorate-general-of-mines-safety-logo\" class=\"wp-image-20407\" srcset=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/india-authority-directorate-general-of-mines-safety-logo.jpg 220w, https:\/\/www.certification-india.com\/wp-content\/uploads\/india-authority-directorate-general-of-mines-safety-logo-150x150.jpg 150w\" sizes=\"auto, (max-width: 220px) 100vw, 220px\" \/><\/figure>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<p><br><strong>The Directorate General of Mines Safety, short DGMS, is a regulatory agency under the Ministry of labour and employment of the Government of India. It\u00b4s main task is to ensure the occupational safety, health and welfare of persons employed in the Indian mining industry (coal, metalliferous and oil mines). DGMS is responsible for issuing and enforcing the relevant regulations for the Indian mining sector, such as the Mines Act of 1952 as well as all rules and regulations it includes. The DGMS is responsible for the DGMS certification of mining equipment.<\/strong><\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong>Which Products are Subject to DGMS Approval?<\/strong><\/h2>\n\n\n\n<p>Most equipment, machinery, appliances and\/or materials intended to be used in the Indian mining sector need to undergo the approval procedure of DGMS. The authority categorizes such products into eight different categories:<\/p>\n\n\n\n<div class=\"wp-block-columns has-background is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\" style=\"background-color:#ececec\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<ol class=\"wp-block-list\">\n<li>Environmental monitoring instruments and devices<\/li>\n\n\n\n<li>Personal protective equipment<\/li>\n\n\n\n<li>Rescue apparatus<\/li>\n\n\n\n<li>Electrical equipment and cables<\/li>\n\n\n\n<li>Machines and other equipment for carrying out mining operations<\/li>\n\n\n\n<li>Explosives and related accessories<\/li>\n\n\n\n<li>Safety materials for use in underground mines<\/li>\n\n\n\n<li>Other specific equipment and materials<\/li>\n<\/ol>\n<\/div>\n<\/div>\n\n\n\n<p>An <strong><a href=\"#overview-dgms-relevant-products\">overview of equipment and materials requiring DGMS approval<\/a><\/strong> can be found on our list below, along with the relevant standards.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong>DGMS Certification Process in India<\/strong><\/h2>\n\n\n\n<p>The following section provides an overview of the DGMS Approval Process in India. While this procedure is followed in most cases, there might be slight deviations for some approvals due to special circumstances or due to the unique nature of the equipment or material.<\/p>\n\n\n<section class=\"mpr-process\">\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>1<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Preparation and submission of application documents<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>2<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Proof of conformity with relevant standards<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>3<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Submission of product tests and technical drawings<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>4<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Field test is carried out<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>5<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Carrying out type and routine tests<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>6<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Reports and application are reviewed<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>7<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>DGMS approval is granted<\/p>\n        <\/div>\r\n    <\/div>\r\n        <div class=\"mpr-process-content\">\r\n        <div class=\"mpr-process-content-icon\">\r\n            \r\n        <\/div>\r\n        <div class=\"mpr-process-step\">\r\n            <span>8<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-process-description\">\r\n            <p>Application for renewed approval after 1-5 years<\/p>\n        <\/div>\r\n    <\/div>\r\n    <\/section>\r\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div id=\"tablepress-24-scroll-wrapper\" class=\"tablepress-scroll-wrapper\">\n\n<table id=\"tablepress-24\" class=\"tablepress tablepress-id-24 tablepress-responsive\">\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-1\">\n\t<td class=\"column-1\">1.<\/td><td class=\"column-2\">The first step involves submitting all relevant application documents for the DGMS certification. These need to be prepared in the format required by DGMS and then submitted by the owner, proprietor or partner of the company seeking approval. <\/td>\n<\/tr>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">2.<\/td><td class=\"column-2\">If applicable Indian Standards exist for the products to be certified, then compliance to these regulations needs to be demonstrated to the authority. This means that certain equipment requires a BIS certification prior to the DGMS approval. Equipment that does not fall under any Indian Standard needs to be compliant with internationally recognized norms (such as ISO, EN, DIN, etc.). These norms may then be accepted by DGMS for the approval process.<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">3.<\/td><td class=\"column-2\">Test reports from an accredited laboratory need to be submitted together with the application, as well as technical drawings which have been approved by the laboratory.<br \/>\n<br \/>\nLike most other certifications in India, non-Indian companies require an Authorized Indian Representative (AIR) for the application. The AIR must be an Indian company and serves as the main contact for the authority throughout the application process. In case applicants do not want to involve local business partners for that matter, MPR India Certification can also provide the AIR service.<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">4.<\/td><td class=\"column-2\">Once all the aforementioned documents have been scrutinized and approved by the authority a \u201cfield trial approval\u201d is granted. The validity period for the field trial approval in India is ranging from three months to one year, depending on the equipment type. After the field trial has been successfully completed, the applicant needs to submit performance reports from the user and\/or DGMS officer in charge. <\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">5.<\/td><td class=\"column-2\">For the next step DGMS requests applicants to perform further product testing on their equipment, namely type tests and routine tests. For type tests, prototypes are being checked against the relevant standards. Routine tests are carried out by the manufacturers on-site for quality assurance.<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">6.<\/td><td class=\"column-2\">Once the field trial reports and test reports have been scrutinized and approved by DGMS, the case is examined, and recommendations are made for the grant of the regular approval. If there are any shortcomings during the field trial the trial period may be extended to solve the related issues by using appropriate corrective measures.<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">7.<\/td><td class=\"column-2\">When the DGMS approval has been granted by the authority, manufacturers receive unique equipment numbers for their approved products. These numbers need to be marked accordingly on the product prior to installation on-site.<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">8.<\/td><td class=\"column-2\">The initial DGMS registration has a validity of 1-5 years. To apply for reapproval of their products, manufacturers must submit performance reports from their Indian users as well as BIS certificates wherever applicable to the authority. <\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n<\/div><!-- #tablepress-24 from cache -->\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What documents are required for the DGMS approval?<\/strong><\/h3>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column has-background is-layout-flow wp-block-column-is-layout-flow\" style=\"background-color:#ececec\">\n<ul class=\"wp-block-list\">\n<li>Application form<\/li>\n\n\n\n<li><a href=\"https:\/\/www.certification-india.com\/en\/bis\/what-is-bis\/\"><strong>BIS certificates<\/strong><\/a> (if applicable)<\/li>\n\n\n\n<li>Business license (in English)<\/li>\n\n\n\n<li>Test reports from an accredited laboratory<\/li>\n\n\n\n<li>Technical drawings approved by an accredited laboratory<\/li>\n\n\n\n<li>Proof of quality control capabilities of the manufacturer (relevant licenses, testing and storage facilities, marketing and after-sales capabilities, etc.)<\/li>\n\n\n\n<li>Documentation for the appointment of the Authorized Indian Representative (AIR) (only for non-Indian applicants)<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong>DGMS <\/strong>Change Management<\/h2>\n\n\n\n<p>Products with a valid DGMS approval must comply with the applicable Indian regulations for DGMS registration. The applicant must assure that the authority will be notified of changes prior to change implementation. These changes include, but are not limited to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Change to the product design<\/li>\n\n\n\n<li>Change in the structure of the product<\/li>\n\n\n\n<li>Changes to a core component<\/li>\n\n\n\n<li>Change in raw material and\/or material supplier<\/li>\n<\/ul>\n\n\n\n<p>The regulations explicitly state that the authority decides in each individual case whether an official application for a change must be submitted and, if so, what the consequences are for the holders of DGMS approval as a result of the change.<\/p>\n\n\n\n<p>It should also be noted that the Indian standards and regulations are subject to revisions and might be updated over time. In case of such updates, any equipment that has received approval in accordance with previous regulations needs to demonstrate compliance with the new regulations. In such a case, manufacturers need to need to file an application for the amendment of the existing approval.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong>MPR <\/strong>Services<\/h2>\n\n\n<section class=\"mpr-theme-services\" style=\"background: url('https:\/\/www.certification-india.com\/wp-content\/uploads\/leistungen_background_indien.png') no-repeat\">\r\n    <div class=\"mpr-theme-services-container\">\r\n        <div class=\"mpr-theme-services-introduction\">\r\n            <h1><span class=\"is-style-h1-headline-content\">Your One-Stop Certification Solution.<\/span><\/h1>\n<p>Our complete package for product certifications for India.<\/p>\n        <\/div>\r\n        <div class=\"mpr-theme-services-service-container\">\r\n                            <div class=\"mpr-theme-services-service\">\r\n                    <div class=\"mpr-theme-services-service-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/angtragsvorbereitung_2.svg\" alt=\"\">\r\n                    <\/div>\r\n                    <p><strong>Clarification<\/strong> of the DGMS approval and BIS certification requirement for your products<\/p>\n                <\/div>\r\n                            <div class=\"mpr-theme-services-service\">\r\n                    <div class=\"mpr-theme-services-service-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/angtragsvorbereitung.svg\" alt=\"\">\r\n                    <\/div>\r\n                    <p><strong>Application<\/strong> preparation and advice<\/p>\n                <\/div>\r\n                            <div class=\"mpr-theme-services-service\">\r\n                    <div class=\"mpr-theme-services-service-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/markierung.svg\" alt=\"\">\r\n                    <\/div>\r\n                    <p><strong>Handling<\/strong> of all communication with the authorities and test labs<\/p>\n                <\/div>\r\n                            <div class=\"mpr-theme-services-service\">\r\n                    <div class=\"mpr-theme-services-service-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/lokal_repraesentatnt.svg\" alt=\"\">\r\n                    <\/div>\r\n                    <p><strong>Provision<\/strong> of the Authorized Indian Representative (AIR), if required<\/p>\n                <\/div>\r\n                            <div class=\"mpr-theme-services-service\">\r\n                    <div class=\"mpr-theme-services-service-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/follow_up_zerti_1.svg\" alt=\"\">\r\n                    <\/div>\r\n                    <p><strong>Organization<\/strong> of the renewal of your DGMS approval<\/p>\n                <\/div>\r\n                    <\/div>\r\n    <\/div>\r\n<\/section>\n\n<section class=\"mpr-theme-kontakt\">\r\n    <div class=\"mpr-theme-kontakt-inhalt\">\r\n        <h3>Contact us!<\/h3>\n<p><strong>MPR India Certification<\/strong> &#8211; expert consulting and implementation of certification projects worldwide.<\/p>\n    <\/div>\r\n    <div class=\"mpr-theme-kontakt-teaser\">\r\n        <div class=\"mpr-theme-kontakt-headline-container\">\r\n            <span class=\"mpr-theme-kontakt-headline\">Contact<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-theme-kontakt-phone-container\">\r\n            <span class=\"mpr-theme-kontakt-phone\">T +49-69-2713769261 [EU]<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-theme-kontakt-phone-container phone-2\">\r\n            <span class=\"mpr-theme-kontakt-phone\">T +1-773-654-2673 (US)<\/span>\r\n        <\/div>\r\n\r\n        <div class=\"mpr-theme-kontakt-mail-container\">\r\n            <a href=\"mailto:info@certification-india.com\"><span class=\"mpr-theme-kontakt-mail\">info@certification-india.com<\/span><\/a>\r\n        <\/div>\r\n    <\/div>\r\n<\/section>\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong>DGMS Certification <\/strong>Overview<\/h2>\n\n\n<div id=\"tablepress-25-scroll-wrapper\" class=\"tablepress-scroll-wrapper\">\n\n<table id=\"tablepress-25\" class=\"tablepress tablepress-id-25 tablepress-responsive\">\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-1\">\n\t<td class=\"column-1\">Validity of the approval<\/td><td class=\"column-2\">1-5 years<\/td>\n<\/tr>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">Time required for approval<\/td><td class=\"column-2\">Approximately 1 year after submission of the application (Approval of field trial: 3 months; Field trial: 6 months; Final product assessment 3 months)<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">Tests required?\t<\/td><td class=\"column-2\">Yes, type tests &amp; routine tests<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">Factory audit required?<\/td><td class=\"column-2\">Can be requested by DGMS; Also relevant for BIS certification, if applicable<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">Representative in country<\/td><td class=\"column-2\">AIR (Authorized Indian Representative) is required<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">Renewal process<\/td><td class=\"column-2\">Renewal must be applied for before the approval expires (60 days \u2013 6 months prior to expiration, depending on overall validity period of the approval)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n<\/div><!-- #tablepress-25 from cache -->\n\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong><strong>DGMS Certification<\/strong><\/strong> FAQ<\/h2>\n\n\n<section class=\"mpr-theme-faq-accordion\">\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>How do I know if my products need a DGMS approval?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>Most equipment, machinery, appliances and\/or materials intended to be used in the Indian mining sector need to undergo the approval procedure of DGMS. Feel free to reach out to us if you would like us to check the requirements for your products.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>How long does the DGMS approval process take?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>After the submission of the application, the process can normally be completed within 1 year. During the first step, DGMS will scrutinize all submitted documents as part of their approval for field trial. Once the field trial has been approved, the equipment needs to be tested on-site in India, for usually a period of 6 months. In the final step the authority will scrutinize the results of the field trial and grant the final approval if they are satisfied with the outcome. This last step usually takes around 3 months.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>How long is the DGMS approval valid?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>The initial DGMS approval is valid for 1-5 years. The validity can also be extended when manufacturers apply for extension 60 days to 6 months prior to the approval\u00b4s expiration. How long applicants need to apply for reapproval in advance depends on the validity period of their approval.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>What is the best way to prepare for DGMS approval?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>All required documents should be carefully prepared before submission to the authority. Applicants need to make confirm that their products comply with the Indian requirements, especially regarding the BIS certification of their products as well as the availability of test reports issued by an accredited laboratory.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>Who is eligible to act as the Authorized Indian Representative (AIR)?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>The AIR must be provided by a local Indian company. The company can be the manufacturers subsidiary or a distribution partner. External service providers such as MPR India Certification can also provide this service.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>In which cases are factory inspections required?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>If factory inspections are required is decided on a case-by-case basis by DGMS. If the equipment also requires a BIS certification, BIS will conduct a factory inspection at the manufacturer\u2019s premises.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n            <div class=\"mpr-theme-faq-accordion-headline\">\r\n            <div class=\"mpr-theme-faq-accordion-headline-content\">\r\n                <span>Do the authorities inform DGMS certificate holders about changes in the regulations?<\/span>\r\n            <\/div>\r\n        <\/div>\r\n        <div class=\"mpr-theme-faq-accordion-content-block\">\r\n            <div class=\"mpr-theme-faq-accordion-content\">\r\n                <div class=\"mpr-theme-faq-accordion-text\">\r\n                    <p>No, information on DGMS approvals is provided in English on the website of the Directorate General of Mines Safety (DGMS). Companies are obliged to inform themselves about changes if they have not contracted a consultancy firm to monitor changes.<\/p>\n                <\/div>\r\n            <\/div>\r\n        <\/div>\r\n    <\/section>\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\" id=\"overview-dgms-relevant-products\"><strong><strong>EQUIPMENT &amp; MATERIALS REQUIRING DGMS APPROVAL<\/strong><\/strong><\/h2>\n\n\n<div id=\"tablepress-13-scroll-wrapper\" class=\"tablepress-scroll-wrapper\">\n\n<table id=\"tablepress-13\" class=\"tablepress tablepress-id-13 tablepress-responsive\">\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-1\">\n\t<td class=\"column-1\">No.<\/td><td class=\"column-2\">EQUIPMENT<\/td><td class=\"column-3\">PROVISION OF CMR, 1957<\/td><td class=\"column-4\">PROVISION OF MMR, 1961<\/td><td class=\"column-5\">PROVISION OF OMR, 1984<\/td><td class=\"column-6\">PROVISION OF MRR, 1985<\/td><td class=\"column-7\">STANDARD FOLLOWED<\/td>\n<\/tr>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1.<\/td><td class=\"column-2\">Flame Safety Lamp<\/td><td class=\"column-3\">2(2)<\/td><td class=\"column-4\">2(2)<\/td><td class=\"column-5\">11(5)<\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS:7577-1986<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2.<\/td><td class=\"column-2\">Cap Lamp<br \/>\n<br \/>\na.\u00a0\u00a0\u00a0\u00a0\u00a0 Flexible cable for miners' cap lamps<br \/>\n<br \/>\nb.\u00a0\u00a0\u00a0\u00a0\u00a0 Miners' cap lamp assemblies (incorporating Pb-acid batteries)<br \/>\n<br \/>\nc.\u00a0\u00a0\u00a0\u00a0\u00a0 Miners' cap lamp batteries (Pb-acid type)<\/td><td class=\"column-3\">2(2)<\/td><td class=\"column-4\">2(2)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS:2593-1984,<br \/>\nIS:5679-1986,<br \/>\nIS:2512-1978<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3.<\/td><td class=\"column-2\">Permitted Explosives<br \/>\n<br \/>\na.\u00a0\u00a0\u00a0\u00a0\u00a0 Permitted Explosives<br \/>\n<br \/>\nb.\u00a0\u00a0\u00a0\u00a0\u00a0 Detonators<br \/>\n<br \/>\nc.\u00a0\u00a0\u00a0\u00a0\u00a0 Detonating Fuses<\/td><td class=\"column-3\">2(23)<\/td><td class=\"column-4\">2(23)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS:6609 (part-2\/ Sec.2)-1974,<br \/>\nIS:6609(part 3) - 1974,<br \/>\nIS: 6609 (part 4)-1984<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4.<\/td><td class=\"column-2\">Tub Couplings<\/td><td class=\"column-3\">89(1)(c)<\/td><td class=\"column-4\">97(1)(c)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5.<\/td><td class=\"column-2\">CO Detector  <\/td><td class=\"column-3\">113(3)(c),<br \/>\n118A(3)(a)(I),<br \/>\n119(1)(b),<br \/>\n121,<br \/>\n125(3)(b),<br \/>\n142(5)<\/td><td class=\"column-4\">116(3)(b),<br \/>\n120(1)(b),<br \/>\n120(2)(c),<br \/>\n122,<br \/>\n126(3)(b),<br \/>\n141(5)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Tubes - IS: 13293- 1992,<br \/>\nCO detectors -\u00a0<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6.<\/td><td class=\"column-2\">Dust Sampler<\/td><td class=\"column-3\">123(3)(b)<\/td><td class=\"column-4\">124(2)(b)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">NCB MRE 113A design as prototype<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7.<\/td><td class=\"column-2\">Stone Dust Barrier<\/td><td class=\"column-3\">123(c)(2)<\/td><td class=\"column-4\">-<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8.<\/td><td class=\"column-2\">Methanometers<\/td><td class=\"column-3\">145(1)(a)<\/td><td class=\"column-4\">-<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Portable (electrical type) IS: 9937-1981<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9.<\/td><td class=\"column-2\">Glass for Flame Safety Lamp<\/td><td class=\"column-3\">157(4)<\/td><td class=\"column-4\">151(4)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS:5676-1986<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10.<\/td><td class=\"column-2\">Cap Lamp Bulbs<\/td><td class=\"column-3\">157(4)<\/td><td class=\"column-4\">151(4)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">For 4V, 0.8A- IS: 2596-1980,<br \/>\n4V, 1.0 A - BIS under formulation<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11.<\/td><td class=\"column-2\">Oil for Flame Safety Lamp<\/td><td class=\"column-3\">157(5)<\/td><td class=\"column-4\">-<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS: 7577-1986<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12.<\/td><td class=\"column-2\">Mechanically propelled vehicle for transport of explosives<\/td><td class=\"column-3\">164(A)(2)(a)<\/td><td class=\"column-4\">-<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13.<\/td><td class=\"column-2\">Exploders<\/td><td class=\"column-3\">174<\/td><td class=\"column-4\">165(3)<\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS: 9836-1981<br \/>\nCircuit tester: IS:9836-1981 Appendix I<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14.<\/td><td class=\"column-2\">Protective Footwear<br \/>\n<br \/>\na.\u00a0\u00a0\u00a0\u00a0\u00a0 Safety rubber canvas boots<br \/>\n<br \/>\nb.\u00a0\u00a0\u00a0\u00a0\u00a0 Protective boots for oilfield workmen<br \/>\n<br \/>\nc.\u00a0\u00a0\u00a0\u00a0\u00a0 Leather safety footwear having direct moulded soles<br \/>\n<br \/>\nd.\u00a0\u00a0\u00a0\u00a0\u00a0 Miners' safety boots with leather soles<br \/>\n<br \/>\ne.\u00a0\u00a0\u00a0\u00a0\u00a0 Rubber knee boots<br \/>\n<br \/>\nf.\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Leather safety shoes for women workers in mines and steel plants<\/td><td class=\"column-3\">191<\/td><td class=\"column-4\">182<\/td><td class=\"column-5\">87<\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS: 3976-1995,<br \/>\nIS:9885(Part I) -1981,<br \/>\nIS: 11226-1993,<br \/>\nIS:1989(part I) - 1986,<br \/>\nIS:3738-1975,<br \/>\nIS: 11225-1985<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15.<\/td><td class=\"column-2\">Helmet<\/td><td class=\"column-3\">191-A<\/td><td class=\"column-4\">182A<\/td><td class=\"column-5\">88<\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS: 2925-1984<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">16.<\/td><td class=\"column-2\">Fire-Resistant Brattices including plastic sheeting and ventilation ducting.<br \/>\n<br \/>\na.\u00a0\u00a0\u00a0\u00a0\u00a0 Fire resistant brattice cloth<br \/>\n<br \/>\nb.\u00a0\u00a0\u00a0\u00a0\u00a0 Fire resistant brattice sheeting made from unsupported plastics<br \/>\n<br \/>\nc.\u00a0\u00a0\u00a0\u00a0\u00a0 Ventilation ducting- vinyl coated semi rigid<br \/>\n<br \/>\nd.\u00a0\u00a0\u00a0\u00a0\u00a0 PVC ventilation tubing (flexible ducting)<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS: 4355-1977,<br \/>\nIS: 11884-1986,<br \/>\nIS: 12814-1989,<br \/>\nIS: 3768-1996<\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">17.<\/td><td class=\"column-2\">Safety Belt<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">27 &amp; 93<\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-3521-1983<\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">18.<\/td><td class=\"column-2\">Friction Props and Prop Setting Devices<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-7586:1975<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">19.<\/td><td class=\"column-2\">Hydraulic Roof Support<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-8421:1977<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">20.<\/td><td class=\"column-2\">Link Bars<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-9171:1979<\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">21.<\/td><td class=\"column-2\">Powered Supports<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">ICIS-001:1991<\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">22.<\/td><td class=\"column-2\">Man-Riding Haulage System<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-9494:1980<\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">23.<\/td><td class=\"column-2\">Detaching Hook<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-7587: 1993 &amp; IS-9011:1978<\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">24.<\/td><td class=\"column-2\">Cage Suspension Gear Including Bridle Chains<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-7587: 1993 &amp; IS-9011:1978<\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">25.<\/td><td class=\"column-2\">Winding Rope<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-1856:1977; IS-3626:1978<\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">26.<\/td><td class=\"column-2\">Balance Rope<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-5203:1969<\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">27.<\/td><td class=\"column-2\">Haulage Rope for Man-Riding<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-1856:1977; IS-3626:1978<\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">28.<\/td><td class=\"column-2\">Underground Conveyor Belting<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-3181:1992 for PVC belting; BCS-730 for Steel cord belting<\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">29.<\/td><td class=\"column-2\">Underground Locomotive<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Reg 95(1) &amp; TM 12 of British Coal, BIS - 9999:1981<\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">30.<\/td><td class=\"column-2\">Internal Combustion Engine<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Reg. 181(1) &amp; Appendix of Reg. 95(1) of CMR '57<\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">31.<\/td><td class=\"column-2\">Flame Proof and Intrinsically Safe Equipment<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-2148:1981,<br \/>\nIS-5780:1980<\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">32.<\/td><td class=\"column-2\">Automatic Contrivance<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Reg. 76(7) of CMR '57<\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">33.<\/td><td class=\"column-2\">Power Brake<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Reg. 74(2) of CMR '57<\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">34.<\/td><td class=\"column-2\">Automatic Speed Chart Recorder<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Reg. 76(6) of CMR '57<\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">35.<\/td><td class=\"column-2\">Emergency Steam Valve<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">Reg. 74 (3) of CMR '57<\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">36.<\/td><td class=\"column-2\">Water Ampoules\/ Gel Ampoules for stemming high explosives,<br \/>\n<br \/>\n(a) Self sealing PVC water ampoules for use in shot holes<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">NCB 414\/ 1964<\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">37.<\/td><td class=\"column-2\">High Pressure Hydraulic Hose with its end fittings<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">BCS-174:1992; BCS 638<\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">38.<\/td><td class=\"column-2\">Dust Respirators<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS: 9473-1980<\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">39.<\/td><td class=\"column-2\">Hydraulic Fluid used in underground machinery<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS 10532:1983; IS 7895:1975<\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">40.<\/td><td class=\"column-2\">Cables used in high, medium and low voltage electrical systems &amp; also flexible cables\/ control cables used for electrical systems of all voltages.<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-1554(Part-I&amp; II),<br \/>\nIS-9968 (Part-I &amp; II), IS-1026; IS-691, 7098 (Part-I &amp; II)<\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">41.<\/td><td class=\"column-2\">Breathing Apparatus<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\">11(5)<\/td><td class=\"column-7\">IS-10245 (Part-I &amp; II)(1st\u00a0rev.)<\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">42.<\/td><td class=\"column-2\">Smoke Helmets &amp; apparatus serving same purpose<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\">11(5)<\/td><td class=\"column-7\">IS-10245 (Part-III): 1982<\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">43.<\/td><td class=\"column-2\">Reviving Apparatus<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\">11(5)<\/td><td class=\"column-7\">IS-13366:1992<\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\">44.<\/td><td class=\"column-2\">Self Rescuers<\/td><td class=\"column-3\">191 D<\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\">11(5)<\/td><td class=\"column-7\">IS-9563: 1980<\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\">45.<\/td><td class=\"column-2\">Electrical Lighting Apparatus<\/td><td class=\"column-3\">181(3)<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">75(2)<\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-2148, IS-2206 (Part-I)<\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\">46.<\/td><td class=\"column-2\">Electrical Equipment for use in hazardous area (Zone 1 &amp; 2)<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">75(2)<\/td><td class=\"column-6\"><\/td><td class=\"column-7\">IS-2148, 5780,13408, 13346, 13947<\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\">47.<\/td><td class=\"column-2\">Gas Detectors<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\"><\/td><td class=\"column-6\">11(5)<\/td><td class=\"column-7\">IS-5780:1980<\/td>\n<\/tr>\n<tr class=\"row-49\">\n\t<td class=\"column-1\">48.<\/td><td class=\"column-2\">Portable Hand Lamps for use in storage tanks<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">55(6)(c)(ii)\u00a0<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-50\">\n\t<td class=\"column-1\">49.<\/td><td class=\"column-2\">Lifeline<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">27 &amp; 93<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-51\">\n\t<td class=\"column-1\">50.<\/td><td class=\"column-2\">Petroleum Storage Tanks<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">55<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<tr class=\"row-52\">\n\t<td class=\"column-1\">51.<\/td><td class=\"column-2\">Pipelines and fittings (Specification approval if not as per ISS)<\/td><td class=\"column-3\"><\/td><td class=\"column-4\"><\/td><td class=\"column-5\">62<\/td><td class=\"column-6\"><\/td><td class=\"column-7\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n<\/div><!-- #tablepress-13 from cache -->\n\n\n\n<h2 class=\"wp-block-heading is-style-border-left-headline\"><strong>Client Testimonials<\/strong><\/h2>\n\n\n\n<p class=\"has-small-font-size\">Please enable cookies to enable embedded YouTube videos. For privacy-related details on data exchange through use of the videos as well as changeable cookie settings, please see the <a href=\"https:\/\/www.certification-india.com\/en\/privacy-policy\/\">privacy policy page<\/a>.<\/p>\n\n\n\r\n<section class=\"mpr-theme-video\">\r\n    <div class=\"mpr-theme-video-content-container\">\r\n        <iframe loading=\"lazy\" title=\"Hear From Our Clients \u2013 MPR Customer Feedback Compilation\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/dDNID5s6bvo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>    <\/div>\r\n\r\n    <div class=\"mpr-theme-video-more\">\r\n        <a class=\"video-button\" href=\"https:\/\/www.youtube.com\/@internationalproductcertif8295\"\r\n           target=\"_blank\">More Videos<\/a>\r\n    <\/div>\r\n\r\n<\/section>\r\n\n\n<section class=\"mpr-kundenstimmen-slider\">\r\n    <div class=\"mpr-kundenstimmen-slider-content  center\">\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Carlo F. Test Manager, Maserati S.p.A. (FCA Group)<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201eMPR International has been able to provide an excellent service. Availability, competence, kindness and respect of the agreed deadlines were perfect. We were able to finish the process even before the deadline. Their support regarding the official tests and the preparation for the audit was great. If help is necessary in the future, it would be a pleasure fur us to work with MPR International again.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Jens L., Head of Homologation, Bugatti Engineering GmbH<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201eWe had very critical deadlines for the certification of our Bugatti Veyron. Fortunately, we found MPR International and were competently supported, both in terms of the vehicle-certification and the certification of our suppliers. We were able to certify our car models in time. Thank you for this excellent service!\u201d<br \/>\r\n<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Claudia S., Staff Project Manager, Tesla Motors, Inc.<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201eMPR International competently supported us in obtain our product certification. We have been very happy with all of the aspects of their pre-audit, complete service package, translation and ongoing compliance updates. We feel that MPR International is an excellent service provider, and gladly recommend them to others who are looking for assistance with product certification.\u201d<br \/>\r\n<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Daniel W., Program Quality Leader, Faurecia<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cWe have certified in recent years numerous plants with MPR International. Due to their resources and good contacts, the certifications could be conducted timely, its high action and reaction speed distinguish MPR International. We are very pleased and appreciate the fair price and the wide range of offered services. There were no costs subsequently charged, making budgeting easy. By these means, thanks again.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Chris N., Sales Coordinator, Vuteq USA, Inc.<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cMPR International took the complex task of certifying our goods for the Indian market and made it effortless. Their expertise and knowledge of the many requirements helped us meet our goals well before our customer deadlines.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Randy H., Program Manager, Webasto Roof Systems Inc., USA<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cAs one of the biggest car part manufacturers, we want to work together only with entirely trustworthy partners. When we urgently needed certification for parts produced in one plant in Kentucky, we decided to hire MPR International. They did a great job, cleanly delivered before deadlines and we saved a lot of work, time and money thanks to the fore- and insight provided. We&#8217;re completely satisfied and will certainly also contact them in the future when confronted with any product certification issues.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Albert H., Corporate Quality Director Operations, IAC Group<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cWith MPR International, we have a very fast and professionally operating partner at our side, whose excellent contacts and good communication allows certification in the shortest possible time. Agreements have without exception always been complied with.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Marc S., Quality Manager, Cooper-Standard Automotive (Deutschland) GmbH<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cMPR International did a fine job on our product certification project. Thank you, in particular for making our audit so pleasant and accurate.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Dennis K., Head of Quality Assurance, Farmingtons Automotive GmbH<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cWe are an automotive supplier of plastic parts in the inner trim area and one of our customers asked us one day to obtain product certification for our parts to sell the vehicle in their market. We wanted to avoid making mistakes and therefore find a complete solution. MPR International has certainly delivered this. We are glad to have chosen the right provider.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Tobias B., Project Manager, Peguform GmbH<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cTo overcome the certification-hurdle was an important priority for us because one of our most important customers insisted on speedy certification. We opted for the complete package from MPR International and have not regretted it.\u201d<\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Marco G., Senior Commodity Manager, Webasto-Edscha Cabrio GmbH<\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">&#8220;Anyone who needs product certification is well advised to choose the service pack from MPR International. We have used it in recent years for the certification of our products manufactured in a variety of factories and at all levels had a positive experience. We especially appreciated the good communication with Julian Busch, our contact person. Thank you Mr. Busch, keep up the good work.&#8221; <\/p>\r\n            <\/div>\r\n                    <div class=\"mpr-theme-kundenstimmen-sldier-slide\">\r\n                <p class=\"mpr-theme-kundenstimmen-slider-headline\">Konrad G., Quality Manager, Management Systems, PARAT Beteiligungs GmbH <\/p>\r\n                <p class=\"mpr-theme-kundenstimmen-slider-inhalt\">\u201cWhen we started out with our research concerning certification for our market, we were very surprised by the complexity of the certification process. But with MPR International, really everything from application to receipt of the printing permission worked out easy. Thank you, we are glad to have taken your service!\u201d<\/p>\r\n            <\/div>\r\n            <\/div>\r\n<\/section>\n\n<section class=\"mpr-theme-other-topics\">\r\n    <div class=\"mpr-theme-teaser-other-topics-content-container\">\r\n                    <div class=\"mpr-theme-other-topics-content\" style=\"background: url('') no-repeat\"><a href=\"https:\/\/certification-india.com\/en\/bis\/what-is-bis\/\">\r\n                    <div class=\"mpr-theme-other-topics-content-background\">\r\n                        <div class=\"mpr-theme-other-topics-content-container-headline\">\r\n                            <span class=\"mpr-theme-other-topics-headline\">BIS Certification<\/span>\r\n                        <\/div>\r\n                        <div class=\"mpr-theme-other-topics-content-container-subline\">\r\n                            <span class=\"mpr-theme-teaser-service-subline\">Learn more&#8230;<\/span><br>\r\n                        <\/div>\r\n                    <\/div>\r\n                <\/a><\/div>\r\n                    <div class=\"mpr-theme-other-topics-content\" style=\"background: url('') no-repeat\"><a href=\"https:\/\/certification-india.com\/en\/peso\/what-is-peso\/\">\r\n                    <div class=\"mpr-theme-other-topics-content-background\">\r\n                        <div class=\"mpr-theme-other-topics-content-container-headline\">\r\n                            <span class=\"mpr-theme-other-topics-headline\">PESO Certification<\/span>\r\n                        <\/div>\r\n                        <div class=\"mpr-theme-other-topics-content-container-subline\">\r\n                            <span class=\"mpr-theme-teaser-service-subline\">Learn more&#8230;<\/span><br>\r\n                        <\/div>\r\n                    <\/div>\r\n                <\/a><\/div>\r\n                    <div class=\"mpr-theme-other-topics-content\" style=\"background: url('') no-repeat\"><a href=\"https:\/\/certification-india.com\/en\/wpc\/what-is-wpc\/\">\r\n                    <div class=\"mpr-theme-other-topics-content-background\">\r\n                        <div class=\"mpr-theme-other-topics-content-container-headline\">\r\n                            <span class=\"mpr-theme-other-topics-headline\">WPC Certification<\/span>\r\n                        <\/div>\r\n                        <div class=\"mpr-theme-other-topics-content-container-subline\">\r\n                            <span class=\"mpr-theme-teaser-service-subline\">Learn more&#8230;<\/span><br>\r\n                        <\/div>\r\n                    <\/div>\r\n                <\/a><\/div>\r\n                    <div class=\"mpr-theme-other-topics-content\" style=\"background: url('') no-repeat\"><a href=\"https:\/\/www.mpr-international.com\/en\">\r\n                    <div class=\"mpr-theme-other-topics-content-background\">\r\n                        <div class=\"mpr-theme-other-topics-content-container-headline\">\r\n                            <span class=\"mpr-theme-other-topics-headline\">Countries<\/span>\r\n                        <\/div>\r\n                        <div class=\"mpr-theme-other-topics-content-container-subline\">\r\n                            <span class=\"mpr-theme-teaser-service-subline\">Learn more&#8230;<\/span><br>\r\n                        <\/div>\r\n                    <\/div>\r\n                <\/a><\/div>\r\n            <\/div>\r\n\r\n<\/section>\r\n\n\n<section class=\"mpr-theme-teaser-service\">\r\n    <div class=\"mpr-theme-teaser-service-content-container\">\r\n                    <div class=\"mpr-theme-teaser-service-content\"><a href=\"https:\/\/certification-india.com\/en\/company\/video-channel\/\">\r\n                    <div class=\"mpr-theme-teaser-service-content-container-headline\">\r\n                        <span class=\"mpr-theme-teaser-service-headline\">Videos<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-subline\">\r\n                        <span class=\"mpr-theme-teaser-service-subline\">All Videos <\/span><br>\r\n                        <span class=\"mpr-theme-teaser-service-subline-2\">MPR Channel<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-service-play-button.png\" alt=\"\">\r\n                    <\/div>\r\n                <\/a><\/div>\r\n                    <div class=\"mpr-theme-teaser-service-content\"><a href=\"https:\/\/www.certification-india.com\/en\/download-info-booklets\/\">\r\n                    <div class=\"mpr-theme-teaser-service-content-container-headline\">\r\n                        <span class=\"mpr-theme-teaser-service-headline\">Booklets<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-subline\">\r\n                        <span class=\"mpr-theme-teaser-service-subline\">Free<\/span><br>\r\n                        <span class=\"mpr-theme-teaser-service-subline-2\">Downloads<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-service-download-icon.png\" alt=\"\">\r\n                    <\/div>\r\n                <\/a><\/div>\r\n                    <div class=\"mpr-theme-teaser-service-content\"><a href=\"https:\/\/certification-india.com\/en\/company\/media-and-publications\/\">\r\n                    <div class=\"mpr-theme-teaser-service-content-container-headline\">\r\n                        <span class=\"mpr-theme-teaser-service-headline\">Media &#038; Publications<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-subline\">\r\n                        <span class=\"mpr-theme-teaser-service-subline\">Publications<\/span><br>\r\n                        <span class=\"mpr-theme-teaser-service-subline-2\"><\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-service-publications.png\" alt=\"\">\r\n                    <\/div>\r\n                <\/a><\/div>\r\n                    <div class=\"mpr-theme-teaser-service-content\"><a href=\"https:\/\/www.certification-india.com\/en\/company\/contact\/\">\r\n                    <div class=\"mpr-theme-teaser-service-content-container-headline\">\r\n                        <span class=\"mpr-theme-teaser-service-headline\">Contact<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-subline\">\r\n                        <span class=\"mpr-theme-teaser-service-subline\">T + 49-69-2713769261<\/span><br>\r\n                        <span class=\"mpr-theme-teaser-service-subline-2\">Send email<\/span>\r\n                    <\/div>\r\n\r\n                    <div class=\"mpr-theme-teaser-service-content-container-icon\">\r\n                        <img decoding=\"async\" class=\"icon\" src=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-service-contact-icon.png\" alt=\"\">\r\n                    <\/div>\r\n                <\/a><\/div>\r\n            <\/div>\r\n\r\n<\/section>\r\n","protected":false},"excerpt":{"rendered":"<p>your one-stop certification solution! What is DGMS Approval? The Directorate General of Mines Safety, short DGMS, is a regulatory agency under the Ministry of labour and employment of the Government of India. It\u00b4s main task is to ensure the occupational safety, health and welfare of persons employed in the Indian mining industry (coal, metalliferous and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":974,"parent":5452,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-21930","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What is DGMS - MPR India Certification<\/title>\n<meta name=\"description\" content=\"Overview of Indian DGMS certification required for machinery and equipment from the mining sector.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is DGMS - MPR India Certification\" \/>\n<meta property=\"og:description\" content=\"Overview of Indian DGMS certification required for machinery and equipment from the mining sector.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/\" \/>\n<meta property=\"og:site_name\" content=\"MPR India Certification\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-17T10:26:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-awards.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/\",\"url\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/\",\"name\":\"What is DGMS - MPR India Certification\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.certification-india.com\\\/wp-content\\\/uploads\\\/teaser-awards.png\",\"datePublished\":\"2023-04-21T13:22:47+00:00\",\"dateModified\":\"2025-11-17T10:26:53+00:00\",\"description\":\"Overview of Indian DGMS certification required for machinery and equipment from the mining sector.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.certification-india.com\\\/wp-content\\\/uploads\\\/teaser-awards.png\",\"contentUrl\":\"https:\\\/\\\/www.certification-india.com\\\/wp-content\\\/uploads\\\/teaser-awards.png\",\"width\":1920,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/what-is-dgms\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Other Services\",\"item\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/other-services\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"What is DGMS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/\",\"name\":\"MPR India Certification\",\"description\":\"Ihr Experte f\u00fcr Indien-Zertifizierungen\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.certification-india.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is DGMS - MPR India Certification","description":"Overview of Indian DGMS certification required for machinery and equipment from the mining sector.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/","og_locale":"en_US","og_type":"article","og_title":"What is DGMS - MPR India Certification","og_description":"Overview of Indian DGMS certification required for machinery and equipment from the mining sector.","og_url":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/","og_site_name":"MPR India Certification","article_modified_time":"2025-11-17T10:26:53+00:00","og_image":[{"width":1920,"height":600,"url":"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-awards.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/","url":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/","name":"What is DGMS - MPR India Certification","isPartOf":{"@id":"https:\/\/www.certification-india.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/#primaryimage"},"image":{"@id":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/#primaryimage"},"thumbnailUrl":"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-awards.png","datePublished":"2023-04-21T13:22:47+00:00","dateModified":"2025-11-17T10:26:53+00:00","description":"Overview of Indian DGMS certification required for machinery and equipment from the mining sector.","breadcrumb":{"@id":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/#primaryimage","url":"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-awards.png","contentUrl":"https:\/\/www.certification-india.com\/wp-content\/uploads\/teaser-awards.png","width":1920,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/www.certification-india.com\/en\/other-services\/what-is-dgms\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.certification-india.com\/en\/"},{"@type":"ListItem","position":2,"name":"Other Services","item":"https:\/\/www.certification-india.com\/en\/other-services\/"},{"@type":"ListItem","position":3,"name":"What is DGMS"}]},{"@type":"WebSite","@id":"https:\/\/www.certification-india.com\/en\/#website","url":"https:\/\/www.certification-india.com\/en\/","name":"MPR India Certification","description":"Ihr Experte f\u00fcr Indien-Zertifizierungen","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.certification-india.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/pages\/21930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/comments?post=21930"}],"version-history":[{"count":32,"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/pages\/21930\/revisions"}],"predecessor-version":[{"id":30905,"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/pages\/21930\/revisions\/30905"}],"up":[{"embeddable":true,"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/pages\/5452"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/media\/974"}],"wp:attachment":[{"href":"https:\/\/www.certification-india.com\/en\/wp-json\/wp\/v2\/media?parent=21930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}